karachi electrical
   
electrical karachi   Home :: Contact us
   
  pakistan electrical
 
electrical solution karachi, pakistan
power sector karachi, pakistan
Instrumentation karachi
karachi instrumentation
instrumentation, pakistan
iso certified, instrumentation services, karachi, pakistan
iso certified, instrumentation services, karachi, pakistan
iso certified, electrical, services, karachi, pakistan
 

 

 

instrumentation, karachi, pakistan

 

IQNet and AIB-VINCOTTE 
USA, INC. ISO 9001:2000
Reg No.: Q06-131

electrical services karachi
       Completed Projects
Electrical Projects
S. No   Clients   Description
1.
Water & Power Development Authority

Electrification of 450 MW Power project and residential colony, Guddu-Kashmore. 
Electrification of colony at Thermal Power Station, Guddu. Electrical  job at Thermal
Power station, Guddu. 
Providing,  installation, testing and commissioning of generators set for temporary
 facilities at Coal power plant, Lakhra, Dadu.
Providing,  fixing and manufacturing of fixtures and carry out all electrical job of 
Russian unit of  210 MW Including laying of  cabling for Boiler, Turbine hall, All 
Auxiliary buildings, Switchyard, Outdoor lighting etc. at Thermal Power Station, Guddu.
Electrical Low Transmission job of 200 Nos. houses unit at Thermal  Power Station, 
Guddu. 
Supply, installation, testing and commissioning of generators set including cabling, 
Switch gears etc. for external facilities  for erection yard at Thermal Power Station, 
Guddu.
Providing and installation of fire alarm system 450 MW and Administration building,
TPS, Guddu.
Illumination and Electrification of Turbine Hall, Auxiliary building for units No. 1, 2 
& 3 (3 x 210 MW).
Electrification of Ware house 06 Nos. at TPS, Jamshoro, WAPDA
Electrical  distribution system for Pipeline for TPS, Jamshoro Modification of Boiler 
210 MW x 1 
No., unit No. 2,  TPS, Guddu
Electrification, Switch Gear Instrumentation, Laying of Cables for  Cooling Tower, 
Pumping Stations  110 x 2 unit, Czech made, TPS, Guddu
Providing,  laying of cable distribution network for erection  yard area, TPS, Guddu.
Providing  lighting system for 220 KV switchyard TPS, Guddu. Providing Lighting 
System  for oil decanting area for  Oil StorageTtanks, Guddu. 
Providing street light network 600 MW CCCP, Guddu. 
Providing street light network for 1000 houses residential colony TPS, Guddu.
Providing street light network for 720 Houses residential units at TPS colony, 
Jamshoro.
Providing lighting complete housing wiring including HT and  LT lines for 200 houses 
at residential  colony Guddu.
Providing HT and LT lines for 180 houses at TPS, Guddu. 
Providing and laying by pass system for 6 KV lines at TPS Guddu.                             
Providing distribution system for 300 MW CMEC, China Unit No. 4 TPS, Muzaffargarh.
Providing road lighting including cabling for 320 MW CMEC, China  unit No.. 4 TPS, 
Muzaffargarh.
Providing road lightingincluding cabling for unit No. 1, 2 & 3 (3 X 210 MW) 
Technoproexport, Russia, TPS, Muzaffargarh.
Providing electrical lighting distribution system for residential units auxiliary building,
Mosque, Club, Shopping Centre,  Schools and Rest House for TPS, Muzaffargarh 
2.
Pakistan State Oil Company Limited
Supply and Installation of Equipment for Electrical & Instrumentation works for Fuel 
Farm Facilities at New Lahore International Air Port  Construction   of Re-Vamp Project
for Lube Oil Facilities, the Job Consist of Electrical Job, etc. on EPC basis for PSO
at Korangi near National Refinery Limited, Karachi.
                               

3.
ENGRO Chemical Pakistan
Electrical Works for Environment Improvement Project at plant site Daharki
4.
Huawei Technologies Ltd China
Laying of Fiber Optic Cables including the activity of splicing and termination, with
all safety measure coatings for   PTCL between various Telephone Exchanges in regions
of  Karachi.
 

 

  Page 1/1   Main menu: Projects Completed
   
 
  pakistan, karachi, instrumentation  
  Copy Rights AL-TARIQ CONSTRUCTORS (PVT.) LTD. 2010